Gazprom OJSC projected facilities: (The submerged crossing construction is fulfilled with microtunneling, Horizontal Directional Drilling (HDD) and trenching methods):


  • Construction of Sakhalin-Khabarovsk-Vladivostok gas pipeline including submerged crossings of the rivers: Obor, Beshenaya, Khivanda, Salasy, Yay, Val, Uanga;

  • Construction of the submerged crossings for Bovanenkovo-Ukhta gas pipeline of the rivers: Usa, Kozhim, Pechora, Ayuva, Chikshina, Izhma, Kosju;

  • Construction of the Ob River submerged crossing for Belogorje-Kirpichny gas pipeline;

  • Construction of the Volga River submerged crossing for Pochinki-Gryazgovez gas pipeline;

  • Construction of the offshore pipeline as a part of Dzhugba-Lazorevskoye-Sochi gas pipeline;

  • Construction of “Nord Steam” gas pipeline including submerged crossings of the rivers: Andoga, Lid, Tikhvinka, Shomushka, Nudksa, Naziya, Avolga, Kivisya, Vyun, Glubokaya, Seleznevka, Buslovka, Peschanya, Sheksna, Volkhov, Neva,as well as submerged crossings of Ushakovskoye Lake and Saymensky Cannal;

  • Construction of the submerged crossings for Ukhta-Torzhok (1) gas pipeline of the rivers: Vym, Verkhnyaya Lupya, Nizhnyaya Lupya, Veled, Malaya Severnaya Dvina, Verkhnyaya Erga, Libenga, Uatjuga, Zareva, Streliza, Sukhona, Lezha and Lombas Lake;

  • Construction of the submerged crossings of the rivers: Val, Askasay, Evay, Dagi, Tomi, Ruchey, Bauri, Bolshie Veni, Dzhimdan, Chachma, Tym (the base gas pipe thread), Tym (the idle gas pipe thread), Vazi as a part of the construction object “Kirinskoye GSF - onshore production facility Sakhalin gas pipeline”;

  • Construction of the submerged crossings of the water courses with trenching, microtunneling and HDD methods as a part of Southern Europe gas pipeline;

  • Development of the project design package and construction of CS Izobilny-Nevinnomyssk gas pipeline;

  • Construction of Amur GPP.

NK-Rosneft OJSC projected facilities:


Reconstruction of the petroleum storage depot in Nakhodka:

  • Jetty upgrade (deep water hydrotechnics), installation of the selling process pipelines from the tank battery to the jetty;

  • Integrated security system installation;

  • Reconstruction of the electric power and waste water disposal systems;

  • Construction of the roads, parking houses, as well as different specialized objects (oil-pumping stations, waste water accounting chambers etc.);

  • Double-service railway rack installation.

LLC Yuganskneftegaz:

  • Construction of the infield pipelines, oil-and-gas-field operation processing facilities and installation of the cluster sites of the Priobskoye, Yuzhno-Balykskoye and Prirazlomnoye fields;

  • Construction of the power mains and voltage transforming plants of the Priobskoye, Yuzhno-Balykskoye and Prirazlomnoye fields;

  • Backfill of the oil-and-gas production cluster sites of Priobskoye field;

  • Constriction of Priobskoye field roads using ground units;

  • Construction of Priobskoye field bridges.

LLC RN-Aero (flight refueling complex in Knevichi airport in Vladivostok):

  • Construction of the receiving (stockpile) petroleum products storages;

  • Installation of the fire extinguishing pump station with the steel tanks;

  • Construction of the railroads and railway discharge rack;

  • Installation of the fuel supply lines and cable racks.

Vankorneft ZAO:

  • Construction of the oil-and-gas-field operation processing facilities and installation of the cluster sites of the Vankorskoye field;

  • Construction of Vankorskoye field roads.

LLC RN-Purneftegas:

  • Infield roads constriction.

Site improvements of the Primorsky oil refinery plant and Vostochny petrochemical integrated refinery plant in Nakhodka:

  • Land planning and development, land flooding protection;

  • Stripping operation, sub-structures and steel structures dismantling;

  • Construction and infrastructure development of the shift camps for builders;

  • Inner roads construction;

  • POS and logistic scheme development.

Transneft OJSC projected facilities: (The construction of the submerged crossings is carried out with microtunneling, Horizontal Directional Drilling (HDD) and trenching methods):


  • Construction of the route roads on the Pur-Pe-Samotlor and

    Pur-Pe-Arctic oil mains;

  • Construction of the route roads on the Eastern Siberia-Pacific Ocean - 2nd stage (ESPO-2) oil main.